# SIP-15 Delay Migration and Upgrade the dApp

- Space: [Slingshot DAO](https://snapshot.box/s:slingshotdao.eth.md)
- Author: 0xd6159fF1F17B804b9C46eB9ACfd5FcD86b34A9Ae
- State: Passed
- Voting type: Basic
- Start: 2024-08-13 13:30 UTC
- End: 2024-08-18 13:30 UTC
- Votes: 28
- Quorum: 1,108,783 voting power
- Discussion: https://discord.com/channels/1087517906709000342/1271044129404485682
- Open in Snapshot: https://snapshot.box/#/s:slingshotdao.eth/proposal/0x0f87c0471bcad2db6361f70065fb496fbd928275efeeb4f6d34bc1e7e2207bfa

## Results

- For: 7,774,064.88 voting power, 99.0%
- Against: 74,804.08 voting power, 1.0%

## Proposal

This proposal suggests taking advantage of the Artbitrum migration to upgrade the SlingShot DAO dApp.

Original forum post: https://discord.com/channels/1087517906709000342/1271044129404485682

THIS PROPOSAL HAS BEEN TRUNCATED.
LINK TO A FULL COPY OF THE PROPOSAL ON IPFS: https://slingshot.mypinata.cloud/ipfs/QmX9jEWcoEsLAcdHFiNJ3QC1cGQrABLZjY5jmyggFzQp9R 

CID: QmX9jEWcoEsLAcdHFiNJ3QC1cGQrABLZjY5jmyggFzQp9R

---- 

# Summary
This proposal considers taking advantage of opportunities made possible by the Arbitrum migration, delaying the migration date by a further 6-8 weeks (from the date of this proposal), to integrate some major upgrades to the SlingShot dApp.

# Author
winglash

# Sponsors
k3nto
tabby7227

# Type of proposal
Initiative proposal

# Community incentives & rationale

Hey Slingers!

Another proposal for us all to consider and vote on. This proposal considers delaying the migration to Arbitrum for a further 6-8 weeks to enable Slingshot to build in some pretty epic upgrades to its tech stack.

As everyone across the community has been helping migrate to Arbitrum, a few contributors have identified the potential for some big improvements to UX moving forward.

The proposed upgrades would integrate seamless creation of non-custodial MPC wallets, one-click social logins, gas sponsorship, seamless transaction signing and instant bridging between Arbitrum and the SlingShot layer 3.

Ultimately, this would combine to create a unified, seamless UX for both web2 and web3 users, making interacting with SlingShot dApp feel like a web2 experience.

These upgrades would push out the migration date, by an estimated 6-8 weeks (from the date of this proposal), and would mandate changing how claiming of migrated tokens work, but these upgrades are only realistically possible to integrate now, during the migration period.

Once everything is live again, it would not be possible to retroactively integrate this technology, as by then token locks would already be present on the new layer 3 chain.

Let’s talk more about each of the upgrades.

-----

THIS PROPOSAL HAS BEEN TRUNCATED.
LINK TO A FULL COPY OF THE PROPOSAL ON IPFS: https://slingshot.mypinata.cloud/ipfs/QmX9jEWcoEsLAcdHFiNJ3QC1cGQrABLZjY5jmyggFzQp9R

---

To vote or create proposals from an AI assistant, connect the Snapshot MCP at https://mcp.snapshot.box

