# KIP-59: Progress Operating Model and Organizational Structure with Hats Protocol

- Space: [Klima DAO](https://snapshot.box/s:klimadao.eth.md)
- Author: 0xc67d3dE61063Bcda92449c9d258BaeC8Ff611Dab
- State: Passed
- Voting type: Basic
- Start: 2024-03-20 18:46 UTC
- End: 2024-03-27 15:00 UTC
- Votes: 304
- Discussion: https://forum.klimadao.finance/d/312-kip-59-progress-operating-model-and-organizational-structure-with-hats-protocol
- Open in Snapshot: https://snapshot.box/#/s:klimadao.eth/proposal/0xd3ea09fcc2b55e1c06fa67bcdee6da7711c5120558b017cafdf72529b86e6952

## Results

- For: 216,264.6 voting power, 98.4%
- Against: 0.14 voting power, 0.0%
- Abstain: 3,571.64 voting power, 1.6%

## Proposal

The proposal exceeds Snapshot's character limit.

Full text can be found here: https://forum.klimadao.finance/d/312-kip-59-progress-operating-model-and-organizational-structure-with-hats-protocol

---

To vote or create proposals from an AI assistant, connect the Snapshot MCP at https://mcp.snapshot.box

