# IIP-193: Monthly INDEX Supply Reduction Program — Treasury

- Space: [Index Coop](https://snapshot.box/s:index-coop.eth.md)
- Author: 0x5635abD956D24A87BbF10Ed3100EAe89E5bb261A
- State: Passed
- Voting type: Basic
- Start: 2025-06-11 00:57 UTC
- End: 2025-06-14 00:57 UTC
- Votes: 13
- Quorum: 672,600 voting power
- Discussion: https://gov.indexcoop.com/t/iip-193-monthly-index-supply-reduction-program-treasury/4883
- Open in Snapshot: https://snapshot.box/#/s:index-coop.eth/proposal/0xb53acd506b879cdd1a1d8b68bfb2880a08869d55c42e24e9b3974db296b37e60

## Results

- For: 744,970.18 voting power, 100.0%
- Against: 0 voting power, 0.0%

## Proposal

**Monthly INDEX Supply Reduction Program — Treasury**  
**Category:** Treasury · Tokenomics  
**Author:** @0xdunerider **Reviewers:** @0xDev, @mrmadila  
**Date:** June 10, 2025  

## Summary
* **Beginning July  1  2025**, Index Coop will reduce the total supply of **INDEX by 1.00 % (100 k INDEX)** each month for three months, sourced from the IC treasury.  
* After the initial three‑month pilot period (July – September), core contributors will consult with the community and review the results **before evaluating program extension into Q4 ’25**.

___

## Background
Members have asked for concrete actions demonstrating disciplined treasury management and tokenomic support. With a fixed **maximum supply of 10 M INDEX**, reductions to that maximum supply represent material tokenomic support.  
The DAO’s long‑term plan to create value for token‑holders remains:

1. **Execute our product vision** — automated re‑balancing leverage products, yield‑generating smart loops, improved distribution, and relentless focus on UI/UX to drive top‑line growth.  
2. **Optimize DAO cost structure** to improve operational efficiency.  
3. **Return future net operating profits** to INDEX holders via governance‑driven, sustainable, programmatic mechanisms.

___

## Program Details
1. **Monthly INDEX Supply Reduction**  
   * 1.00 % of total supply (100,000 INDEX / month).  
2. **Source**  
   * INDEX stored in the IC treasury multisig.  
3. **Duration**  
   * **July 1 – September 30 2025** (three consecutive monthly supply‑reduction events).  
   * Post‑September, we’ll consult with the community, review the impact, and may extend for another three months.

___

## Timeline
* **Early June 2025:** Forum announcement  
* **July  1  2025:** First 1 % supply reduction  
* **August 1 2025:** Second 1 % supply reduction  
* **September 1 2025:** Third 1 % supply reduction  
* **End of September 2025:** Community consultation and program review; decide on program extension

Voting:
FOR: Approve the supply reduction program

AGAINST: Reject the supply reduction program

---

To vote or create proposals from an AI assistant, connect the Snapshot MCP at https://mcp.snapshot.box

