# SCP- 210 Product Lite Workstream March 1-August 31 2026

- Space: [ShapeShift Ideation](https://snapshot.box/s:ideation.shapeshiftdao.eth.md)
- Author: 0x46143B38E1418FF86e2fA938c588b2Edfb2ED4C1
- State: Closed
- Voting type: Single choice
- Start: 2026-02-20 22:54 UTC
- End: 2026-02-27 23:00 UTC
- Votes: 6
- Discussion: https://forum.shapeshift.com/t/product-lite-workstream-mar-1-aug-31-2026/3377
- Open in Snapshot: https://snapshot.box/#/s:ideation.shapeshiftdao.eth/proposal/0xbfa937b04edc2d1d9159ee8cbf6c51d778954d9ec057574152142f0c4d983b0d

## Results

- For: 2,035,333.6 voting power, 12.7%
- For With Changes: 10,605,299.61 voting power, 66.4%
- Against: 3,323,619.78 voting power, 20.8%

## Proposal

## **Abstract**

This proposal restructures the Product Workstream into a lean, transition-oriented model aligning with the DAO’s current revenue realities.

Key changes:

- FBL moves to 3 days/week starting March 2, then 10% time in April and forward. With contingency for extra hours on April, May, and June if needed.
- PTT reduced to 20% time all in FOX.
- Welcoming Discostu into BD focused role
- Total 6-month budget ≈ **$98k**
- Introduction of a phased transition toward new leadership
- Explicit contingency buffer (time-limited and gated)
- Clear revenue and user growth metrics

This is not a continuation of prior terms. It is a staged reduction designed to:

1. Preserve strategic coherence
2. Codify Product into a transferable system
3. Align burn with runway
4. Transition toward a lighter long-term structure

---

# **Why This Change**

Current conditions:

- Revenue: ~$20–50k/month
- Marketing exiting
- Continued runway sensitivity

This renewal reflects a disciplined contraction while protecting execution capacity for the future.

This proposal reduces burn while institutionalizing product judgment and a plan for succession.

---

# **Operating Model Overview**

The DAO requires Product capacity for:

- Market & competitor research
- Initiative prioritization
- Business-case-driven proposals
- User feedback loops
- UX refinement where necessary
- Strategic public positioning

However, simply reducing to a generic “part-time PM + hourly designer” model introduces risk:

- Loss of prioritization coherence
- Repeated roadmap resets
- Engineering alignment becomes messier but solvable
- Weaker external positioning

This proposal introduces a **three-phase transition**

---

# **Phase 1 (First 30 days)**

### **Systemization & Handoff**

During this phase, Product operates at 3 days/week.

Primary objective:

Build and document a transferable Product Operating System.

Deliverables:

- Prioritization rubric (I wrote a shipping agreement, we should refine and finally align on it on etc.)
- Formalize initiative driven development where Business case → spec lifecycle (add documentation)
- Market scanning & competitor monitoring template and cadence
- “strategic direction of features” standard for Engineering
- Competitive dashboard artifacts
- Training and onboarding of successor (internal or recruited)

This phase focuses on institutionalizing judgment, not expanding scope.

---

# **Phase 2 (Following 2 Months)**

### **Strategic Oversight & Contingency**

- Product Lead shifts to ~10% strategic oversight
- Weekly prioritization sanity checks
- High-leverage strategic input
- Public-facing ecosystem positioning (Spaces, podcasts, expanding our narrative advantage)

If a new Workstream Lead is in place:

- Move to an advisory role paid per initiative review, strategy sprint, or meeting cluster.

If a successor is **not** ready:

- Transitional involvement extends depending on  contingency funds pre-budgeted

This structure:

- Prevents silent scope creep
- Aligns incentives toward rapid transition and protects continuity

---

# **Phase 3 (Final 3 Months)**

If Phase 1 deliverables are completed early and leadership confidence is high, Phase 2 may be shortened and this phase unnecessary.

### **Stabilization, Health Check & Reassessment**

After phase 1 & 2, the DAO enters a stabilization period. 

During this phase:

- Successor (if appointed) operates the Product function.
    - success is a proposal that passes governance transition responsibilities and deliverables.
- Engineering continues initiative-driven execution
- BD owns measurable pipeline targets
- Marketing execution follows documented cadence

If Phase 2 oversight concluded:

- Optional advisory only if requested by governance
    - Paid per initiative review or strategy sprint

If a successor is **not** ready:

- Transitional involvement continues until end of proposal.

# **Revenue & Growth Focus**

Primary targets for this term:

- Target 15% QoQ revenue growth (at least one month of about 75K)
- Restore app DAU toward 500
- Grow agent DAU toward 10 WAU and then 100 WAU
- Close one marquee API partner and work with BD to pipeline out the 3-5 in process
- Increase revenue from differentiated features and increase awareness
    - Twitter impressions
    - Podcaast appearances
    - Spaces
    - possibly events

Shipping KPI:

- Initiative velocity (prototype → shipped)
- Qualitative Engineering checks

Every initiative must:

- Have a business case or validated prototype
- Tie to revenue or acquisition
- Have measurable success criteria

# **Strategic Lens**

Product efforts will focus on the same lens:

- Get any asset
- Earn yield on anything
- Discover and manage leverage
- Automate boring workflows with AI
- Treat agents as customers

Revenue-generating actions rule.

---

# **Scope Stewardship During Marketing Transition**

With Marketing exiting, Product will temporarily steward:

- Translation squad compensation coordination (look to fireb0mb for a new proposal)
- PR firm contract management
- BD/comarketing oversight, training, and acceleration

AI will reduce overhead where appropriate. However, refinement and judgment remain necessary to avoid low-quality output.

The goal is to leave behind documented processes, templates that are LLM-ready and useable, integrate this accross linear and our chat services, and arrive at stable execution.

---

# **BD & Marketing Alignment**

This term will:

- Elevate BD into measurable revenue pipeline ownership
- Align initiative roadmap with BD close cycles
- Stabilize creative execution via on-demand design (existing resource)
- Formalize PR and positioning processes
- Close some API customers
- Use chain launches to drive customer acquistion

Marketing shifts from cost center to revenue amplifier.

---

# **Responsibilities**

- Prioritize and adjust roadmap toward revenue and user growth
- Coordinate initiatives & priority with Engineering
- Surface new market opportunities
- Own release polish and outcome accountability
- Lead spec kickoffs and retros
- Facilitate office hours and performance artifacts
- Manage workstream budget and contributor payments
- Support cross-workstream alignment

---

# **What This Model Does Not Include**

- No new speculative product lines
- No expansive documentation cycles
- No 5-day/week availability
- No undefined scope expansion
- No permanent reliance on contingency

This is a lean, transition-first structure.

---

# **Risks & Mitigation**

Risks:

- Successor readiness timeline
- Revenue growth lag

Mitigation:

- Phased reduction & Time-limited contingency buffer
- Clear measurable targets
- Defined transition window

If revenue does not show sustained improvement by mid-term, the DAO should reassess scope or transition Product into advisory-only capacity.

---

# **Budget**

Total 6-month budget: $**98445**

- Product Lead at 3 days/week during Phase 1, then 10% time moving forward.
- PTT at 20% time all in fox
- Lean contractor use of time-limited contingency funds

Check out the spreadsheet here https://docs.google.com/spreadsheets/d/1d-N8P2YJq9dLKt38ucSD5jw-hF8-WDGKIyeGDnmjJio/edit?gid=814223319#gid=814223319

First 2 months, with upfront costs
![first 2 months.png](ipfs://bafkreiekafmyb7gpveoozmapu376dkncy65ue2tiidouo53mynbesz7iji)

Totals
![the totals.png](ipfs://bafkreid6dqofmpdi5k2am5eq7wcq26di24y2mngnrvhbpve4aqi3hl7auq)
---

# FOR

Approve the Product Workstream  from March 1 – August 31, 2026.

This proposal reduces burn, institutionalizes product judgment, protects execution continuity, and builds toward a lighter long-term structure aligned with DAO sustainability.

# FOR with changes:

Make these specific changes {XYZ}

# AGAINST:

No, thank you.

---