# [Grove Artifact] UniswapV3 Facet - Offchain Parameter Update

- Space: [Grove](https://snapshot.box/s:grovefinance.eth.md)
- Author: 0x8541cCfc6E7EAcEbD233C6789a0FbF7C708B0E68
- State: Passed
- Voting type: Basic
- Start: 2026-09-21 16:00 UTC
- End: 2026-09-24 16:00 UTC
- Votes: 3
- Discussion: https://forum.skyeco.com/t/september-24-2026-proposed-changes-to-grove-for-upcoming-spell/28229/6
- Open in Snapshot: https://snapshot.box/#/s:grovefinance.eth/proposal/0x81db71f29ead9ca13e26a4222b916be15515b92f399be08a629f556459d961bd

## Results

- For: 85,096,394.05 voting power, 100.0%
- Against: 0 voting power, 0.0%
- Abstain: 0 voting power, 0.0%

## Proposal

# [Grove Artifact] UniswapV3 Facet - Offchain Parameter Update - September 21, 2026

Grove's Operational Facilitator has placed a proposal into the voting system on behalf of nested contributor Grove Development Company.

## Review

If approved, this proposal will update the UniswapV3 facet in the Grove Artifact to reflect the advancement to the next phase of Lindy building for the facet, which runs separately from the Tokenized Treasury instances—each Diamond PAU facet builds its own operating history. The [Capital Ratio Requirement](https://sky-atlas.io/#3828778e-0197-4ce9-a836-6770d04f2ea9) falls to the floor of its ramp-up plan and the maximum exposure reaches the level Grove asked the plan to end at; further increases are outside this plan and would need their own proposal and risk review.

### Change Summary

-   Capital Ratio Requirement (CRR): 10% → 2%
    
-   Maximum exposure: 25,000,000 → 100,000,000 (USDS)
    

The starting values have been approved through the [September 7, 2026 Artifact update poll](https://snapshot.org/#/s:grovefinance.eth/proposal/0x2810a096c5e4e1aec50d7694d2c129ef90339bf49f46cafb942706244d1e0392) and encoded in [A.6.1.1.2.2.6.1.3.1.12.3.2.5 - Off-chain Operational Parameters](https://sky-atlas.io/#2e60fa48-4088-4ea3-86d5-80d7fb45979c).

These parameters—[confirmed by the Core Council Risk Advisor](https://forum.skyeco.com/t/september-24-2026-proposed-changes-to-grove-for-upcoming-spell/28229/8)—apply only if the Instance has met the phase requirements. Should the required exposure not be held, or the phase requirements otherwise not be met, by the time the September 24, 2026 Grove spell has executed, the update is not applied and returns in a later cycle.

---

The required Grove Artifact changes can be found in the following pull request: https://github.com/sky-ecosystem/next-gen-atlas/pull/340

## Outcomes

-   If "For" receives more than 50% of votes cast, excluding abstentions, the proposal will be approved, subject to the Core Council Risk Advisor confirming that the facet has met the phase requirements. The associated pull request will then be merged into Grove's Artifact. If the requirements are not confirmed, the update is not applied and returns in a later cycle.
    
-   If "Against" receives the most votes, the proposal will be rejected. No changes will be implemented.

---

To vote or create proposals from an AI assistant, connect the Snapshot MCP at https://mcp.snapshot.box

