# Bloom Budget Proposal #31: Magnus Capital Raise Timeline Adjustment

- Space: [Bloom Studio](https://snapshot.box/s:gov.bloomstudio.eth.md)
- Author: 0xD80e4Ef6169e5F737430be8a845237Befb9a0aDB
- State: Closed
- Voting type: Weighted
- Start: 2025-04-06 18:28 UTC
- End: 2025-04-09 18:28 UTC
- Votes: 17
- Quorum: 32,879,786 voting power
- Open in Snapshot: https://snapshot.box/#/s:gov.bloomstudio.eth/proposal/0xac2b7d56f5a620705a325ef34be5efc3fa1bd8e1af0a5ee17f785456272e85f2

## Results

- Adopt: 35,994,861.19 voting power, 100.0%
- Reassess: 0 voting power, 0.0%
- Abstain: 0 voting power, 0.0%

## Proposal

**Authors**
lapras, baguette, bagelface

**Type**
Budget

**Abstract**
This proposal outlines a revised timeline for Magnus’s first raise threshold, extending the target to the end of May. The adjusted plan takes into account current market dynamics and internal scheduling factors, ensuring optimal positioning for a successful capital raise. The intent is to align strategic milestones such as tooling maturity, user validation, and brand presentation with external outreach.

**Background**
Initial plans for Magnus's early raise were tied to deliverables and assets that have since experienced delay, in part due to internal timing dependencies. Rather than rushing into market conversations prematurely, we believe the added time will not only compensate for lost ground but enhance the overall story and outcomes of the raise. This approach is also sensitive to broader shifts in the fundraising environment, which rewards clarity, traction, and differentiated presentation.

As of now, approximately 31.25% of the total $400K threshold has been met ($75K confirmed via qualifying internal allocation + $50K via Neon). This proposal formalizes how the remainder of the raise may be earned and distributed across development milestones in 2025.

**Deliverables**
The raise will be earned through 10 defined increments. The first 4 of these 10 increments will be valid to be earned through **Q2 2025**, with the remaining 6 increments tied to **Q4 2025** deliverables. The goal is to pace meaningful progress with accountable outputs.

This updated timeline replaces the timeline explicitly defined in the previous proposal ([Bloom Budget Proposal #26: Advisement Partnership Program](https://snapshot.box/#/s:gov.bloomstudio.eth/proposal/0xb4157e146c07fc33af1c74b42d31b519fd4840fbbb7dc2ea25196aa31380155e)) as well as all relevant milestones throughout the proposal, respectively.

---