# Project Caribou — Phase 2 Proposal

- Space: [Arrow Air](https://snapshot.box/s:arrowair.eth.md)
- Author: 0xf00f1B31C033fBc15Aba7846EC001D55c274b798
- State: Passed
- Voting type: Basic
- Start: 2026-08-25 11:19 UTC
- End: 2026-09-01 11:19 UTC
- Votes: 6
- Quorum: 2,000,000 voting power
- Open in Snapshot: https://snapshot.box/#/s:arrowair.eth/proposal/0x1757de24471648d6a9690a2308a91895714a3a606a92fecbffc6e626dc42e3dc

## Results

- For: 3,469,701.43 voting power, 100.0%
- Against: 0 voting power, 0.0%
- Abstain: 0 voting power, 0.0%

## Proposal

### **Summary**

This proposal seeks DAO approval to transition Project Caribou into Phase 2. Following the completion of Phase 1 build and electronics integration, Phase 2 focuses on executing the PT1 flight-test campaign, building an upgraded PT1.5 prototype in the USA featuring modular payload bays, and releasing full open-source community build documentation.

### **Phase 1 & August Interim Progress**

-   **Completed Phase 1 Milestones:** Assembled PT1 (182 kg dry weight), designed and integrated all 3 Caribou PCBs, wrote CBC firmware, and completed powered ground tests with 1% motor matching and zero CAN errors.
    
-   **SORA 2.5 Application Submitted:** The complex SORA 2.5 application has been fully finalized and submitted to regulatory authorities, establishing a legal framework for 12–24 months of flight testing.
    
-   **Folding Arm Connectors Fitted:** PT1 has already been upgraded with foldable motor arm connectors during August, achieving a transport footprint of **1.4 m × 2.4 m**.
    
-   **August Budget Usage:** The remaining safe wallet balance (~5,876 USDC) directly funded the SORA regulatory application process and the PT1 folding arm integration work during August.
    

### **Phase 2 Scope & Deliverables**

1.  **PT1 Flight-Test Campaign:** Complete tethered hover, step-by-step controller tuning, automated waypoint missions, endurance/lift testing, and transition to free flight operations under SORA 2.5.
    
2.  **PT1.5 Build & Flight (USA):** Build an updated iteration in Texas in collaboration with JPL featuring factory folding arms, structural weight reductions, and dual standard payload bays (compatible with DJI Agras T40 liquid/seeding modules).
    
3.  **PT1 Standardization:** Retrofit PT1 to matching PT1.5 structural specs to maintain two standardized test vehicles.
    
4.  **Community Build Release:** Publish full documentation (BOM, build guides, config files, test protocols) enabling independent community fabrication.
    

### **Timeline, Budget & Continuity**

-   **Window:** September 2026 – February 2027 (6 Months).
    
-   **Budget Cap:** Unchanged at $30,000/month ($25,000 labor / $5,000 hardware) in accordance with AIP-007, with no rollover.
    
-   **Partner Funding:** The US build is executed in partnership with JPL, avoiding major additional prototype hardware costs for the DAO.
    
-   **Governance Continuity:** All leadership, team organization, and governance processes remain completely unchanged from the initial project proposal.
    

### **Voting Options**

-   **For:** Approve Phase 2 proposal and funding
    
-   **Against:** Reject Phase 2 proposal
    
-   **Abstain:** Abstain
    

---

**References:**

-   [Phase 2 Discussion Thread](https://dao.arrowair.com/t/project-caribou-phase-1-review-phase-2-proposal/181)
    
-   [Initial Project Proposal Snapshot](https://snapshot.org/#/s:arrowair.eth/proposal/0xe0e89a2110946195ae27348b3331de0f945a059d1fbaaf7242b43cb322021f09)
    
-   [https://youtu.be/B31S-8h4dhA](https://youtu.be/B31S-8h4dhA)

---